{"id":2523,"date":"2026-06-15T07:34:49","date_gmt":"2026-06-15T07:34:49","guid":{"rendered":"https:\/\/hongtengdaparts.com\/?post_type=product&#038;p=2523"},"modified":"2026-06-16T08:43:07","modified_gmt":"2026-06-16T08:43:07","slug":"bomba-hidraulica-principal-hitachi-ex400-ex400-1","status":"publish","type":"product","link":"https:\/\/hongtengdaparts.com\/pt\/product\/hitachi-ex400-ex400-1-hydraulic-main-pump\/","title":{"rendered":"Bomba Hidr\u00e1ulica Principal Hitachi EX400 \/ EX400-1 \u2013 Remanufaturada na China (4622371 \/ 4246412)"},"content":{"rendered":"<h3>Informa\u00e7\u00f5es detalhadas<\/h3>\n<table border=\"1\" cellpadding=\"5\">\n<tbody>\n<tr>\n<th>Par\u00e2metro<\/th>\n<th>Valor<\/th>\n<th>Observa\u00e7\u00e3o<\/th>\n<\/tr>\n<tr>\n<td><b>Origem<\/b><\/td>\n<td>China<\/td>\n<td>Remanufaturada<\/td>\n<\/tr>\n<tr>\n<td><b>Garantia<\/b><\/td>\n<td>3 a 6 meses conforme detalhes do produto; N\u00e3o oferecemos garantia para produtos originais e usados.<\/td>\n<td>\u2013<\/td>\n<\/tr>\n<tr>\n<td><b>Quantidade m\u00ednima de pedido<\/b><\/td>\n<td>1 pe\u00e7a<\/td>\n<td>\u2013<\/td>\n<\/tr>\n<tr>\n<td><b>Produ\u00e7\u00e3o Mensal<\/b><\/td>\n<td>300 pe\u00e7as\/m\u00eas<\/td>\n<td>\u2013<\/td>\n<\/tr>\n<tr>\n<td><b>Detalhes da embalagem<\/b><\/td>\n<td>Embalagem em caixa de madeira ou personalizada<\/td>\n<td>\u2013<\/td>\n<\/tr>\n<tr>\n<td><b>Condi\u00e7\u00f5es de pagamento<\/b><\/td>\n<td>T\/T, XT, PayPal, Western Union<\/td>\n<td>\u2013<\/td>\n<\/tr>\n<tr>\n<td><b>Prazo de entrega<\/b><\/td>\n<td>5-8 dias \u00fateis (dependendo da situa\u00e7\u00e3o do pedido)<\/td>\n<td>\u2013<\/td>\n<\/tr>\n<tr>\n<td><b>M\u00e9todo de Envio<\/b><\/td>\n<td>Frete mar\u00edtimo, a\u00e9reo ou via DHL\/FEDEX\/TNT\/EMS<\/td>\n<td>\u2013<\/td>\n<\/tr>\n<tr>\n<td><b>Medidas de Garantia<\/b><\/td>\n<td>Inspecionamos o produto e enviamos fotos detalhadas ao comprador para confirma\u00e7\u00e3o.<\/td>\n<td>\u2013<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Nota: As informa\u00e7\u00f5es de aplica\u00e7\u00e3o fornecidas s\u00e3o apenas para refer\u00eancia. Confirme o n\u00famero da pe\u00e7a e compare com o componente antigo antes de comprar. Em caso de d\u00favidas, n\u00e3o hesite em\u00a0<a href=\"https:\/\/hongtengdaparts.com\/pt\/entre-em-contato-conosco\/\">Entre em contato conosco<\/a>.<\/strong><br \/>\n<strong>Vale a pena escolher um produto que apresente desempenho est\u00e1vel, alta confiabilidade, f\u00e1cil instala\u00e7\u00e3o e resposta r\u00e1pida.<\/strong><\/p>\n<h3><span class=\"\">O Dilema das 40 Toneladas: Reparar, Substituir ou Arriscar?<\/span><\/h3>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Voc\u00ea tem uma EX400 ou EX400-1 que perdeu o f\u00f4lego. A lan\u00e7a sobe mais devagar do que antes. A rota\u00e7\u00e3o hesita. O \u00f3leo esquenta. O mec\u00e2nico diz: \u201ca bomba est\u00e1 cansada\u201d. Agora voc\u00ea enfrenta a mesma decis\u00e3o que todo propriet\u00e1rio de uma m\u00e1quina de 40 toneladas mais antiga enfrenta:<\/span><\/p>\n<ul>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Comprar nova original<\/span><\/strong><span class=\"\">\u00a0\u2013 Seguro, mas o pre\u00e7o poderia comprar um carro pequeno. Dif\u00edcil de justificar em uma m\u00e1quina que j\u00e1 tem mais de 10.000 horas.<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Comprar uma bomba usada<\/span><\/strong><span class=\"\">\u00a0\u2013 Barata no in\u00edcio, mas voc\u00ea n\u00e3o faz ideia de quantas horas ela tem, se foi operada com \u00f3leo contaminado ou se seus rolamentos j\u00e1 est\u00e3o com picagens. Voc\u00ea est\u00e1 comprando a falha oculta de outra pessoa.<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Enviar sua bomba para \u201creparo\u201d<\/span><\/strong><span class=\"\">\u00a0\u2013 Geralmente significa um jogo de veda\u00e7\u00f5es e pintura. Vazar\u00e1 novamente em 500 horas.<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Escolher uma bomba devidamente remanufaturada<\/span><\/strong><span class=\"\">\u00a0\u2013 \u00c9 aqui que o dinheiro inteligente \u00e9 investido. Mas apenas se o processo de remanufatura realmente substituir as pe\u00e7as corretas.<\/span><\/p>\n<\/li>\n<\/ul>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Vamos falar sobre o que \u201cremanufaturado\u201d realmente significa \u2013 e por que a maioria das oficinas erra.<\/span><\/strong><\/p>\n<h3><span class=\"\">O Mito do \u201cRevedado\u201d<\/span><\/h3>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Muitas oficinas hidr\u00e1ulicas oferecem bombas \u201creconstru\u00eddas\u201d. Eles desmontam, limpam, substituem O-rings e retentores de eixo, aplicam tinta nova e consideram o servi\u00e7o conclu\u00eddo. O problema? O bloco de cilindros e a placa de v\u00e1lvula ainda est\u00e3o desgastados. Os rolamentos ainda est\u00e3o fatigados. Os patins dos pist\u00f5es ainda est\u00e3o riscados. Dentro de 500 a 1.000 horas, o vazamento interno retorna, a temperatura do \u00f3leo sobe e voc\u00ea perde pot\u00eancia novamente. Voc\u00ea pagou por um curativo, n\u00e3o por um conserto.<\/span><\/p>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Nosso processo de remanufatura \u00e9 diferente porque partimos de uma verdade simples: metal desgastado n\u00e3o se desgasta sozinho. Voc\u00ea deve substitu\u00ed-lo.<\/span><\/strong><\/p>\n<h3><span class=\"\">O Que Realmente Substitu\u00edmos (N\u00e3o Apenas Limpamos)<\/span><\/h3>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Quando remanufaturamos sua bomba EX400\/EX400-1 (OEM 4622371 \/ 4246412), cada um destes componentes \u00e9 inspecionado e quase sempre substitu\u00eddo:<\/span><\/p>\n<div class=\"ds-scroll-area ds-scroll-area--show-on-focus-within ds-scroll-area--enabled _1210dd7 c03cafe9\">\n<table>\n<thead>\n<tr>\n<th><span class=\"\">Componente<\/span><\/th>\n<th><span class=\"\">Por Que Falha<\/span><\/th>\n<th><span class=\"\">O que fazemos<\/span><\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><span class=\"\">Bloco de cilindros<\/span><\/td>\n<td><span class=\"\">Riscos devido a \u00f3leo contaminado<\/span><\/td>\n<td><span class=\"\">Ret\u00edfica ou substitui\u00e7\u00e3o<\/span><\/td>\n<\/tr>\n<tr>\n<td><span class=\"\">Placa de v\u00e1lvula<\/span><\/td>\n<td><span class=\"\">Sulcos de desgaste, perda de planeza<\/span><\/td>\n<td><span class=\"\">Ret\u00edfica superficial para planeza &lt;0,002mm<\/span><\/td>\n<\/tr>\n<tr>\n<td><span class=\"\">Conjuntos de pist\u00e3o<\/span><\/td>\n<td><span class=\"\">Desgaste do patim, riscos no furo do cilindro<\/span><\/td>\n<td><span class=\"\">Substitui\u00e7\u00e3o como conjunto correspondente<\/span><\/td>\n<\/tr>\n<tr>\n<td><span class=\"\">Plat\u00f4<\/span><\/td>\n<td><span class=\"\">Sulcos causados pelos sapatos dos pist\u00f5es<\/span><\/td>\n<td><span class=\"\">Recondicionamento ou substitui\u00e7\u00e3o<\/span><\/td>\n<\/tr>\n<tr>\n<td><span class=\"\">Rolamentos (todos)<\/span><\/td>\n<td><span class=\"\">Trincas por fadiga devido a ciclos de carga<\/span><\/td>\n<td><span class=\"\">Sempre novos \u2013 nunca reutilizados<\/span><\/td>\n<\/tr>\n<tr>\n<td><span class=\"\">Retentor do eixo<\/span><\/td>\n<td><span class=\"\">Endurecimento, desgaste do l\u00e1bio<\/span><\/td>\n<td><span class=\"\">Novo (fluorborracha, alta temperatura)<\/span><\/td>\n<\/tr>\n<tr>\n<td><span class=\"\">Todos os O-rings e juntas<\/span><\/td>\n<td><span class=\"\">Deforma\u00e7\u00e3o permanente, degrada\u00e7\u00e3o qu\u00edmica<\/span><\/td>\n<td><span class=\"\">Novos<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Isso \u00e9 uma restaura\u00e7\u00e3o completa, n\u00e3o um refresco cosm\u00e9tico.<\/span><\/strong><\/p>\n<h3><span class=\"\">O Teste Real: N\u00e3o um Eixo Girando, Mas uma Dinamometria Sob Carga<\/span><\/h3>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Qualquer bomba pode girar manualmente. Uma bomba remanufaturada adequada deve provar seu valor sob press\u00e3o total de trabalho. Ap\u00f3s a remontagem, cada bomba EX400 que remanufaturamos vai para uma bancada de teste hidr\u00e1ulico e passa por um ciclo de teste completo:<\/span><\/p>\n<ul>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Rampa de press\u00e3o at\u00e9 34,3 MPa (4.975 psi)<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Medi\u00e7\u00e3o de vaz\u00e3o na rota\u00e7\u00e3o nominal<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Verifica\u00e7\u00e3o de vazamento do dreno da carca\u00e7a (indicador de desgaste interno)<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Tempo de resposta do sensor de carga<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Verifica\u00e7\u00e3o do corte de press\u00e3o<\/span><\/p>\n<\/li>\n<\/ul>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Voc\u00ea recebe um relat\u00f3rio de teste com n\u00fameros reais. Sem suposi\u00e7\u00f5es. Sem \u201cparece forte\u201d. Voc\u00ea v\u00ea os dados antes de pagar.<\/span><\/p>\n<h3><span class=\"\">Por Que Isso Importa para Sua EX400 \/ EX400-1<\/span><\/h3>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Sua m\u00e1quina pesa 40 toneladas. Ela move milhares de metros c\u00fabicos de material todos os dias. Quando a bomba principal perde apenas 10% de sua efici\u00eancia, voc\u00ea perde:<\/span><\/p>\n<ul>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">10\u201315% no tempo de ciclo<\/span><\/strong><span class=\"\">\u00a0\u2013 carregamento mais lento, menos caminh\u00f5es por hora<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Maior consumo de combust\u00edvel<\/span><\/strong><span class=\"\">\u00a0\u2013 o motor trabalha mais para compensar o vazamento interno<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">\u00d3leo superaquecido<\/span><\/strong><span class=\"\">\u00a0\u2013 a energia desperdi\u00e7ada se transforma em calor, danificando veda\u00e7\u00f5es e mangueiras<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Falhas imprevis\u00edveis<\/span><\/strong><span class=\"\">\u00a0\u2013 uma bomba cansada n\u00e3o morre lentamente; ela falha subitamente<\/span><\/p>\n<\/li>\n<\/ul>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Uma bomba remanufaturada adequada restaura a vaz\u00e3o, press\u00e3o e efici\u00eancia originais. Sua EX400 escava como fazia h\u00e1 8.000 horas. N\u00e3o \u201cquase\u201d. N\u00e3o \u201csuficientemente bom\u201d. Exatamente.<\/span><\/p>\n<h3><span class=\"\">A Oferta Simples<\/span><\/h3>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Mantemos bombas remanufaturadas EX400\/EX400-1 (4622371 \/ 4246412) em estoque em nosso armaz\u00e9m em Guangzhou. N\u00e3o um n\u00facleo que esperamos reconstruir no pr\u00f3ximo m\u00eas. Uma unidade finalizada, testada, pintada, tampada e pronta para ser montada.<\/span><\/p>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">O que voc\u00ea recebe:<\/span><\/strong><\/p>\n<ul>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Uma bomba restaurada aos padr\u00f5es de desempenho OEM<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Rolamentos novos, veda\u00e7\u00f5es novas, superf\u00edcies de desgaste retificadas<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Relat\u00f3rio de teste hidr\u00e1ulico dispon\u00edvel mediante solicita\u00e7\u00e3o<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Caixa de madeira resistente, sem fumiga\u00e7\u00e3o, pronta para exporta\u00e7\u00e3o<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">5 a 8 dias \u00fateis para a maioria dos destinos globais<\/span><\/p>\n<\/li>\n<\/ul>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">O que voc\u00ea n\u00e3o recebe:<\/span><\/strong><\/p>\n<ul>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Uma bomba usada com pintura nova<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">\u201cAposta \u201dno estado em que se encontra\"<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Um remendo de 500 horas<\/span><\/p>\n<\/li>\n<\/ul>\n<h3><span class=\"\">Antes de Pedir \u2013 Uma Foto, Um N\u00famero de S\u00e9rie<\/span><\/h3>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Como os modelos EX400 e EX400-1 possuem pequenas varia\u00e7\u00f5es (diferentes ajustes do regulador, diferentes orienta\u00e7\u00f5es das portas), precisamos de duas informa\u00e7\u00f5es suas:<\/span><\/p>\n<ol start=\"1\">\n<li>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">N\u00famero de s\u00e9rie da m\u00e1quina<\/span><\/strong><span class=\"\">\u00a0(come\u00e7a com EX400 ou EX400-1)<\/span><\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Uma foto clara da placa de identifica\u00e7\u00e3o da bomba antiga<\/span><\/strong><span class=\"\">\u00a0(mostrando o n\u00famero de pe\u00e7a OEM, mesmo que desbotado)<\/span><\/p>\n<\/li>\n<\/ol>\n<p class=\"ds-markdown-paragraph\"><span class=\"\">Confirmaremos o encaixe exato e enviaremos um or\u00e7amento firme em at\u00e9 24 horas. Sem suposi\u00e7\u00f5es. Sem \u201cisso deve servir\u201d.\u201d<\/span><\/p>\n<hr \/>\n<blockquote>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Instala\u00e7\u00e3o em linguagem simples:<\/span><\/strong><br \/>\n<span class=\"\">\u2013 A pequena linha de drenagem da bomba para o tanque deve estar aberta. Se estiver comprimida ou bloqueada, a press\u00e3o se acumular\u00e1 dentro da bomba e romper\u00e1 o selo do eixo principal na primeira partida do motor.<\/span><br \/>\n<span class=\"\">\u2013 Antes de aparafusar a nova bomba, troque todos os filtros hidr\u00e1ulicos e lave o tanque se a bomba antiga falhou de forma catastr\u00f3fica (metal no \u00f3leo). Detritos matam uma bomba reconstru\u00edda t\u00e3o r\u00e1pido quanto uma nova.<\/span><br \/>\n<span class=\"\">\u2013 Use arruelas de cobre ou an\u00e9is de veda\u00e7\u00e3o novos em cada conex\u00e3o de mangueira. Selos antigos vazar\u00e3o.<\/span><br \/>\n<span class=\"\">\u2013 Ap\u00f3s a instala\u00e7\u00e3o, deixe o motor em marcha lenta por alguns minutos e mova lentamente cada alavanca (lan\u00e7a, bra\u00e7o, ca\u00e7amba, giro, deslocamento) para eliminar o ar do sistema. A m\u00e1quina pode ficar lenta no in\u00edcio \u2013 isso \u00e9 normal.<\/span><\/p>\n<\/blockquote>\n<blockquote>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Garantia \u2013 honesta e transparente:<\/span><\/strong><br \/>\n<span class=\"\">O per\u00edodo de garantia \u00e9 de 3 a 6 meses, dependendo dos detalhes do produto.\u00a0<\/span><strong><span class=\"\">N\u00e3o oferecemos garantia para pe\u00e7as originais usadas ou reconstru\u00eddas.<\/span><\/strong><span class=\"\">\u00a0Acreditamos em fazer o trabalho corretamente antes do envio, n\u00e3o em prometer consertar depois. Nosso valor est\u00e1 no trabalho \u2013 pe\u00e7as novas, montagem precisa, testes completos e fotos antes da expedi\u00e7\u00e3o. Se precisar de uma garantia tradicional, pergunte-nos sobre op\u00e7\u00f5es novas do mercado de reposi\u00e7\u00e3o.<\/span><\/p>\n<\/blockquote>\n<p class=\"ds-markdown-paragraph\"><strong><span class=\"\">Seu EX400 ou EX400-1 ainda tem anos de trabalho pela frente. A bomba principal n\u00e3o deve ser o motivo para par\u00e1-lo. Envie-nos os detalhes da sua m\u00e1quina \u2013 forneceremos uma bomba reconstru\u00edda que realmente funciona.<\/span><\/strong><\/p>","protected":false},"excerpt":{"rendered":"<table border=\"1\" cellpadding=\"5\">\n<tbody>\n<tr>\n<th>Par\u00e2metro<\/th>\n<th>Valor<\/th>\n<\/tr>\n<tr>\n<td><b>Modelo aplic\u00e1vel<\/b>}]<\/td>\n<td>EX400, EX400-1<\/td>\n<\/tr>\n<tr>\n<td><b>Nome do produto<\/b><\/td>\n<td>Bomba Hidr\u00e1ulica Hitachi<\/td>\n<\/tr>\n<tr>\n<td><b>N\u00fameros das Pe\u00e7as<\/b><\/td>\n<td>4622371, 4246412<\/td>\n<\/tr>\n<tr>\n<td><b>Tipo de Produto<\/b><\/td>\n<td>Bomba Hidr\u00e1ulica<\/td>\n<\/tr>\n<tr>\n<td><b>Categoria<\/b><\/td>\n<td>Sistema Hidr\u00e1ulico<\/td>\n<\/tr>\n<tr>\n<td><b>Marca<\/b><\/td>\n<td>HTD<\/td>\n<\/tr>\n<\/tbody>\n<\/table>","protected":false},"featured_media":2527,"template":"","meta":[],"product_brand":[],"product_cat":[68],"product_tag":[],"class_list":["post-2523","product","type-product","status-publish","has-post-thumbnail","product_cat-hitachi-hydraulic-pump","first","instock","shipping-taxable","product-type-simple"],"_links":{"self":[{"href":"https:\/\/hongtengdaparts.com\/pt\/wp-json\/wp\/v2\/product\/2523","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hongtengdaparts.com\/pt\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/hongtengdaparts.com\/pt\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hongtengdaparts.com\/pt\/wp-json\/wp\/v2\/media\/2527"}],"wp:attachment":[{"href":"https:\/\/hongtengdaparts.com\/pt\/wp-json\/wp\/v2\/media?parent=2523"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/hongtengdaparts.com\/pt\/wp-json\/wp\/v2\/product_brand?post=2523"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/hongtengdaparts.com\/pt\/wp-json\/wp\/v2\/product_cat?post=2523"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/hongtengdaparts.com\/pt\/wp-json\/wp\/v2\/product_tag?post=2523"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}